2012-067Projects Previously Bid
Notice of Intent to Award posted on April 3, 2013
Owners’ Representative on the Progressive Design/Build delivery of the Authority’s new Smith Mountain Lake Water Treatment Plant and Lakes to Forest Water Line Extension Project.
N/AN/A
The Bedford Regional Water Authority (‘Authority’) is requesting proposals from qualified consultants to serve as the Owners’ Representative on the Progressive Design/Build delivery of the Authority’s new Smith Mountain Lake Water Treatment Plant and Lakes to Forest Water Line Extension Project located in Bedford County, Virginia.  To view the complete “Request for Proposal” you can find it under the "Advertisement" section below. Proposals will be accepted until Tuesday, March 19, 2:00 p.m. local time.
Attachment
  
2012-011Projects Previously Bid
Open for bids
Waterline Extension and Well System Abandonment
May 14, 2013 until 3:00pmBedford County Public Service Authority at the Bedford County Public Service Authority’s Office, 1723 Falling Creek Road, Bedford, Virginia 24523
This project will include the construction of an eight (8”) waterline along the road from Sigh-N-Pine Road to Anthony Home Road including water services, pressure reducing valves, fire hydrants and miscellaneous site work with associated improvements.
  
2012-046Projects Previously Bid
Sealed BIDS for the construction of the Hillcrest Waterline Extension will be received by the Bedford County Public Service Authority at the Bedford County Public Service Authority’s Office, 1723 Falling Creek Road, Bedford, Virginia 24523 until 2:00 PM, local prevailing time on June 6, 2013, and then at said office publicly opened and read aloud.
Waterline Extension and Well Abandonment
June 6, 2013Bedford County Public Service Authority
This project will include installation of approximately 4,400 feet of 8”water main and 330 feet of 4” water main along with the associated appurtenances, including 1 PRV, 1 boring for roadway crossing, demolition of the existing tank and water treatment facility, and well abandonment.
  
noneProjects Previously Bid
Project for Bid
Bids for chemicals for water and wastewater plants
July 1, 2013Bedford Regional Water Authority Board Room, 1723 Falling Creek Road
The Bedford Regional Water Authority (‘Authority’) is requesting bids for various chemicals used in the water and wastewater plants. Proposals will be accepted until Monday, July 1, 3:00 p.m. local time.
   
  
Projects Previously Bid
Out for bid.
The project consists of replacing approximately 1,230 linear feet of 18-inch and 16-inch gravity sanitary sewer line and manholes, several stream crossings, and associated appurtenances.
November 17, 2015 at 2pm1723 Falling Creek Road, Bedford, Virginia 24523
The project consists of replacing approximately 1,230 linear feet of 18-inch and 16-inch gravity sanitary sewer line and manholes, several stream crossings, and associated appurtenances.
  
Projects Previously Bid
Sealed Bids for the 2016 Annual Term Contract for Water and Sewer Line Construction for Bedford Regional Water Authority will be received, by the Bedford Regional Water Authority (Authority) at 1723 Falling Creek Road, Bedford, Virginia 24523, until 2:30 p.m. local time on Thursday, March 17, 2016, at which time the Bids received will be publically opened and read aloud in the Board Room, at 1723 Falling Creek Road, Annex Building. 
Bedford Regional Water Authority is accepting bids for an Annual Term Contract for Water and Sewer Line Construction related to the repair, replacement, and installation of municipal infrastructure, such as water main, sanitary sewers, etc. The work shall be performed on an as-needed basis and in accordance with Bedford Regional Water Authority Master Specifications.

Work Items shall be bid in unit price for labor and equipment. Bid forms shall be completed in full.

The term of the contract shall be for a twelve (12) month period, and the unit prices shall be valid for the term of the contract. An option for an additional twelve (12) month extension may be considered if both parties agree, and there are no significant changes to the conditions of the contract.
Thursday, March 17, 2016Board Room, at 1723 Falling Creek Road, Annex Building
  
Projects Previously Bid
Project out for bid
To accomplish its mission of providing quality water and sewer services to its customers, the Authority owns and operates various facilities for the production, treatment, and distribution of water, and the collection, conveyance, and treatment of wastewater.  Professional engineering services are required to assist the Authority with its operations and with particular projects.  Services needed may include but not necessarily be limited to the following:
a. Provide evaluations, recommendations, cost and time estimates, feasibility studies, preparation of schematic or preliminary designs, and preliminary engineering reports.
b. Provide survey, design, administration, and inspection services for construction projects.
c. Perform analyses and modeling of existing systems to assess impact of new facility construction.
d. Assure that construction contract documents are in conformance with generally accepted engineering practices and comply fully with all applicable codes and regulations.
e. Provide specifications which reflect current requirements, standards and product availability.
f. Attend and provide summary reports at regular Authority Board meetings, if requested.
March 15, 2016Board Room, 1723 Falling Creek Road, Annex Building
The Bedford Regional Water Authority seeks proposals from qualified professional engineering firms to provide selected engineering services and assistance under a term contract on an as needed basis. The Authority provides water and sewer services to residents and businesses within Bedford County and the Town of Bedford.
  
Projects Previously Bid
Out for bid
The work to be performed hereunder shall include the furnishing of all labor, materials, tools, transportation, supplies, equipment and appurtenances necessary for the complete and satisfactory
rehabilitation of the Valley Mills Water Tank. The work shall include, but is not limited to, surface preparation, repainting, rehabilitation, and the repair or replacement of appurtenances as described in the Contract Documents.
April 20, 2017 at 2:00pm1723 Falling Creek Road
1. Interior Painting: Sandblasting and painting of all interior surfaces shall be per Section 09 97 00 – Coatings for Welded Steel Potable Water Storage Tanks. Interior painting shall include tank ladders, roofs, manways, hatches, and all other appurtenances associated with the tank
2. Disinfection: Upon the completion of painting and rehabilitation of the interior of the tank, CONTRACTOR shall sterilize the tank interior per Section 33 16 13 – Aboveground Water Utility Storage Tanks.
3. Exterior Painting: Sandblasting and painting of all exterior surfaces shall be per Section 09 97 00 – Coatings for Welded Steel Potable Water Storage Tanks. Exterior painting shall include tank ladders, roofs, manways, hatches, and all other appurtenances associated with the tank.
4. Valley Mills Tank Rehabilitation: The following repairs and modifications shall be made to the 15,000 gallon tank at Valley Mills.
a. Remove any accumulated sediment from bottom of tank (unknown).
b. Provide and install a new 12-inch aluminum frost-proof vent.
c. Provide and install a ladder cage and lockable gate to the bottom of the exterior tank ladder.
d. Repair the existing level indicator, float, and pulley system cable.
e. Install exterior base sealant around the base of the storage tank to prevent moisture buildup between the foundation and steel floor.
f. Provide and install stainless steel interior ladder with a flexible cable safety climb device. System is to include a cable sleeve and safety harness.
  
2016-079Projects Previously Bid
Sealed BIDS for the construction of the Central WWTP Disinfection System Improvements will be received by the Bedford Regional Water Authority at the Bedford Regional Water Authority’s Office, 1723 Falling Creek Road, Bedford, Virginia 24523.

BID OPENING POSTPONEMENT: Bid opening date is postponed from Thursday, February 22, 2018, to Thursday, March 1, 2018, at 2:00 pm in the Bedford Regional Water Authority Board Room.   The deadline for questions and clarifications is extended to 5:00 pm on Wednesday, February 21, 2018.
Thursday March 1, 2018 1723 Falling Creek Road, Bedford, Virginia 24523
This project will include replacement of existing gaseous chlorine and sulfur dioxide disinfection systems with liquid sodium hypochlorite and sodium bisulfite disinfection systems. Project includes modifications to existing chemical feed areas and provision of bulk storage tanks, chemical metering pump systems, chlorine residual analyzers. Project also includes structural and electrical improvements to support the disinfection systems.
  
Projects Previously Bid
Sealed Bids for the Annual Term Contract for Water and Sewer Construction Services for Bedford Regional Water Authority will be received, by the Bedford Regional Water Authority (Authority) at 1723 Falling Creek Road, Bedford, Virginia 24523, until 2:00 p.m. local time on Thursday, June 7, 2018, at which time the Bids received will be publically opened and read aloud in the Board Room, at 1723 Falling Creek Road, Annex Building. 
Thursday, June 7, 2018, 2:00 p.m. EST1723 Falling Creek Road, Bedford, Virginia 24523
Bedford Regional Water Authority is accepting bids for an Annual Term Contract for Water and Sewer Construction Services related to the repair, replacement, and installation of municipal infrastructure, such as water mains, sanitary sewers, etc. The work shall be performed on an as-needed basis and in accordance with Bedford Regional Water Authority Master Specifications.
Work Items shall be bid in unit price for labor and equipment. Bid forms shall be completed in full.

The term of the contract shall be for a twelve (12) month period, and the unit prices shall be valid for the term of the contract. An option for up to two additional twelve (12) month extensions may be considered if both parties agree, and there are no significant changes to the conditions of the contract.
  
2019-010Projects Previously Bid
The Bedford Regional Water Authority will be accepting sealed BIDS for renovations to their administrative building, located at 1723 Falling Creek Road, Bedford, Virginia 24523.
Interior Painting, flooring, and light construction
Bids will be received until 2:00 PM EST on February 28, 2019 and then publicly opened and read aloud. 1723 Falling Creek Road, Bedford, Virginia 24523
Renovation of the Administration Building located at 1723 Falling Creek Road in Bedford.
  
Projects Previously Bid
Out for bid
The following services shall be performed on an as needed basis:
a. Locations are to be neatly mowed as specified by the Maintenance Manager.
b. Entrances, walkways, and paved areas are to be clean of debris upon completion of job.
c. Areas around structures, signs, trees, mulched areas, fences, and embankments are to be trimmed at least monthly.
d. Weeds and grass along the fence line and in the gravel areas are to be sprayed as needed.
e. Mowing frequencies may be increased or decreased as determined by the Maintenance Manager.
f. Mowing locations may be added or deleted as determined necessary by the Maintenance Manager.
g. The BRWA reserves the right to perform any or all of the Mowing and Grounds Keeping services utilizing BRWA staff.
March 271723 Falling Creek Road, Bedford, Virginia 24523
The Bedford Regional Water Authority (BRWA) is seeking Bids from professional lawn care services for the maintenance of multiple sites located throughout Bedford County.
  
00103Projects Previously Bid
Invitation for Bids
Sealed BIDS for the construction of the Bedford Regional Water Authority’s Parking Lot Expansion will be received by the Bedford Regional Water Authority at the Bedford Regional Water Authority’s Office, 1723 Falling Creek Road, Bedford, Virginia 24523 until 2:00 PM, local prevailing time on Thursday, April 18, 2019 and then at said office publicly opened and read aloud.

Pre-bid Information
Deadline for questions on the CONTRACT DOCUMENTS must be made in writing to the Bedford Regional Water Authority, Attn: Rhonda English or via email at r.english@brwa.com by 2:00pm on Monday, April 8, 2019.
Thursday, April 18, 20191723 Falling Creek Road, Bedford, Virginia 24523
This project will include the installation of a new 34 space parking lot and the associated site features.  The site will include a new drive entrance onto Falling Creek Road and a connection to the existing parking lot. The successful contractor will be responsible for the grading and construction of site features identified in the contract documents.
Attachment
  
2020-043Public/Private Partnerships (PPEA)
Public notice of unsolicited proposal acceptance.
In accordance with the Public Private Educational Facilities and Infrastructure Act of 2002 ("PPEA"), the Bedford Regional Water Authority (the "Authority") has received a proposal for review from Garney Companies, Inc. for the design and construction of the Ivy Creek Interceptor and construction of the Route 460 Pump Station. The Ivy Creek Interceptor being a sewer extension from the Forest service area to the City of Lynchburg to provide expanded public wastewater service through a gravity interceptor as defined in a preliminary engineering report entitled ‘Ivy Creek Interceptor Divisions 5 and 6 PER’ and dated February 10, 2020. The Route 460 Pump Station being a water booster station designed for construction on East Crest Drive in Bedford, Virginia to transmit flow between the Lakes, Forest, and Central water service areas.

The Authority intends to evaluate the proposal, may negotiate a comprehensive agreement with the proposer based on the proposal, and will accept for simultaneous consideration any competing proposals that comply with the procedures adopted by the Authority and the provisions of the PPEA.

The non-proprietary sections of the Garney Companies, Inc. proposal along with the Authority’s PPEA procedures and the preliminary engineering report are available for download from the Authority’s website at www.brwa.com.
Proposals will be accepted until Tuesday, July 7, 20201723 Falling Creek Road Bedford, Virginia  24523
Plase see attached documents for further information.
  
Projects Previously Bid
Sealed Bids for the Annual Term Contract for Water and Sewer Construction Services for Bedford Regional Water Authority will be received, by the Bedford Regional Water Authority (Authority) at 1723 Falling Creek Road, Bedford, Virginia 24523, until 2:00 p.m. local time on Wednesday, December 2, 2020, at which time the Bids received will be publically opened and read aloud in the Board Room, at 1723 Falling Creek Road, Annex Building.
Bedford Regional Water Authority is accepting bids for an Annual Term Contract for Water and Sewer Construction Services related to the repair, replacement, and installation of municipal infrastructure, such as water mains, sanitary sewers, etc. The work shall be performed on an as-needed basis and in accordance with Bedford Regional Water Authority Master Specifications.

Work Items shall be bid in unit price for labor and equipment. Bid forms shall be completed in full.

The term of the contract shall be for a twelve (12) month period, and the unit prices shall be valid for the term of the contract. An option for up to two additional twelve (12) month extensions may be considered if both parties agree, and there are no significant changes to the conditions of the contract.
Wednesday, December 2, 2020Board Room, at 1723 Falling Creek Road, Annex Building
  
2020-110Projects for Bid
The Bedford Regional Water Authority (Authority) will announce its award by April 28, 2021.
To accomplish its mission of providing quality water and sewer services to its customers, the Authority owns and operates various facilities for the production, treatment, and distribution of water, and the collection, conveyance, and treatment of wastewater. Professional engineering services are required to assist the Authority with its
operations and with particular projects. Services needed may include but not necessarily be
limited to the following:

a. Provide evaluations, recommendations, cost and time estimates, feasibility studies,
preparation of schematic or preliminary designs, and preliminary engineering reports.

b. Provide survey, design, administration, and inspection services for construction projects.

c. Perform analyses and modeling of existing systems to assess the impact of new facility construction.

d. Assure that construction contract documents are in conformance with generally accepted engineering practices and comply fully with all applicable codes and regulations.

e. Provide specifications that reflect current requirements, standards, and product availability.

f. Attend and provide summary reports at regular Authority Board meetings if requested.
N/AN/A
The Authority seeks proposals from qualified professional engineering firms to provide selected engineering services and assistance under a term contract on an as-needed basis. The Authority provides water and sewer services to residents and businesses within Bedford County and the Town of Bedford.